<p>aclaworks-caribbean-architecture-commercial-business-design</p>
<p>aclaworks-caribbean-architecture-commercial-business-design</p>
<p>aclaworks-caribbean-architecture-commercial-business-design</p>
<p>aclaworks-caribbean-architecture-commercial-business-design</p>
<p>aclaworks-caribbean-architecture-commercial-business-design</p>
<p>aclaworks-caribbean-architecture-commercial-business-design</p>
Showing of
BG headquarters

A speculative office building with high quality, low cost maintenance exterior finishes, this corporate design features passive solar control incorporated into the façade with the use of large overhangs, louvered sunshading, and low energy transmission glass. The construction period was 16 months and the building was completed on schedule and within budget.

Project Architect: acla:works

Project Contractor:  NH International

Civil + Structural Engineers:  KS&P Limited

Mechanical + Electrical Engineers:  ADeB Consultants Ltd

Quantity Surveyor:  Hart & Leonard

Project Management:  acla:works

Area:  3,600 sq. metres

Function:  Office building

Location:  St Clair, Trinidad

Status:  Completed 2002